Ongoing Projects

Roads, Storm Water Drains, Sanitary Sewers and Others Services at AL DHAHIRAH
Ongoing Project
1 million cum of Imported fill
200,000 tons of Asphalt for Roads
200 kms. of kerbstone
56 kms. Stormwater Dia 250 mm
45 kms. Sanitary line Dia 200 mm to 400mm
45000m3 Concrete equivalent Manholes & Gullies
Client: Ministry of Public Works (MPW)
Owner: Ministry of Public Works (MPW)
Project Dates: 2015–2026
Contract Value: 2,500,000 OMR
INSTALLATION AND REPLACEMENT OF CRUDE TRANSIT LINES IN SOUTH EAST DUQHM
Ongoing Project

The Scope of Work of this project covers design and detailed AL DUQHM AL BALUSHI in House Engineering and Manufacturing of Heavy metal Pipelines engineering, procurement, supply, fabrication, construction/ installation, testing and commissioning of carbon steel pipelines (approximately length of 28 KM with various sizes from 16” to 36”) with pigging facilities and manifolds. Carry out mechanical and pipeline works, electrical works, instrumentation works, civil and structural works and cathodic protection works and tie-in work with existing lines and facilities as required. Carry out all other work which could reasonably inferred to be deemed as necessary to provide with complete, proven and operable facility.

Owner: Petroleum Development Oman (PDO)
Client: Petroleum Development Oman (PDO)
Project Dates: 2019 - 2027
Contract Value: 7,645,244 OMR
Residential Complex for OOMCO Employees
Ongoing Project
Location: Salalah, Sultanate of Oman
Architect/Consultant: Bahwan Engineering Consultants
Owner: OOMCO
Status: Completion in 9 Months
Contract Value: OMR 100 million
Built-Up Area: 182,000m²
AL WUSTA Treatment Plant Contract No. 01-Plant & Stations. Contract No. 03-Infrastructure & Road Works
Ongoing Project
Al Wusta, Sultanate of Oman.
Consultant: AL Duqhm AL Balushi Construction & Engineering CO LLC.
Owner: AL Wusta Governorate.
Status: In Completion Stage
Melamine and Urea-1 Revamp Project
Ongoing Project

Melamine plant Scope of work- design & detailed engineering of all civil and Structural works, Complete Civil Construction works including piling, Substation and Control building, Cooling tower and a warehouse, Supply ,fabrication and Erection of all Steel structures for the plant, Erection of all equipment including heavy & critical lifts, Fabrication and Erection of all Piping , GRP Piping ,Electrical & Instrumentation Installation works, associated Painting, Insulation and Fireproofing and manpower assistance during commissioning and start-up.

Urea-1 revamp Scope of Work – Complete Civil Construction works, Erection of all Steel structures for the plant, Erection of all equipment including heavy & critical lifts, Fabrication and Erection of all Piping, GRP Piping, Electrical & Instrumentation Installation works, associated Painting Insulation and manpower assistance during commissioning & start-up.

Client: OMAN Fertiliser Company
Location: AL BATINAH NORTH, Sultanate of Oman
Status: Shut Down Phase
Value: OMR 150 Million
Engineering Consultant: WS Atkins & Partners Overseas – Design & detailed engineering of Civil and Structural.
Role & Scope of Work: Prime EPC (Civil works) & Construction Contractor
NAMA Substation, Erection,Testing & Commissioning works
Ongoing Project

Engineering, Civil works, Building Services, Fire, Safety, HVAC, Mechanical, Electrical Erection, Testing & Commissioning Works for NAMA, Salalah. Power Transmission System Expansion Phase 5, 6, 7, 8 & Phase 8 – Various Substations Packages throughout Salalah Sector

Client: NAMA (Various Main Contractor viz. i.e. Siemens/ABB/Areva/Isolux)
Location: Salalah North, Sultanate of Oman
Status: 2026 Completion
Engineering Consultant: Oman Engineering Associates
The Samharam Industrial Estate & Housing Re-development Project
Ongoing Project

Project’s scope comprises the design construction, completion remedying defects during Maintenance Period of the Works of the new Shadadiya Industrial Zone fully being developed by Al Duqhm Al Balushi CO LLC

The design and construction and remedying of defects of the new Sambhram Industrial Zone of a total area of approximately 4.9 million m2 and having a land use profile including industrial plots ranging from 1,000m2 together with plots for General Services, Utilities and a Technological Park and with assigned plots for various Administrative Offices, Environmental Monitoring Centre, Mosque, Health Centers, Fire Stations, Petrol Stations, Retail, Security, Restaurants, Truck Service Centre, Roads and Parking areas, Truck Waiting Area, etc., including the following:

  • Site surveying work.
  • Soil analysis, physical, mechanical, chemical, and biological, including underground water.
  • Climate and hydrological studies
  • Traffic Impact and Transportation Studies
  • Preparation of a detailed Environmental Impact Assessment (EIA) covering all effecting parameters of the
  • different components of the project.
  • The design and construction of the infrastructure works necessary for the project, including:
  • Major and Minor Collector and Access Roads with Parking Areas all including Street Lighting and Signage

Electrical System supply and distribution system:

Electrical System supply and distribution system including One 400/132/11KV Mains station, four 132KV/11KV Sub-Main stations, 132KV buried ring main connecting Mains station and 91Nos. 11KV/415v local area substations connected to Sub-Main stations with 11KV and/or 415v supply to plots from 11KV/415v substations. All equipment and transformers shall be included in all Main, Sub-Main and local area substations (two transformers)

Owner: Industrial Authority of Sultanate of Oman
Location: Sultanate of Oman
Start Date: 01 May 2022
Completion: July 2026 (Ongoing)
Consultant: Al Duqhm Al Balushi Construction & Engineering Co. LLC
Contractor: Al Duqhm Al Balushi Construction & Engineering Co. LLC
  • Telecommunication System (ductworks only)
  • Potable Water Supply Network including Water Pumping Station, Underground tank and two Elevated Water Storage Tanks
  • Storm Water Network, Underground holding Tank & Pump room and holding pond & pump room.
  • Sewage Water Network
  • Sewage Treatment Plant (Package Sewage Treatment plant)
  • Industrial Wastewater Networks (Food, Mixed & Chemical)
  • Landscaping (Soft & Hard)
  • Irrigation Network, Underground Tank & Pump station
  • Fire Fighting Network, Underground Tank & Pump Station
  • Site Security System (Fence, Gates, Boundary Walls, Guard House, and CCTV)
  • Environmental Monitoring Control Building.

Project Statistics (all quantities are approximate)

  • Clear and remove surface matters, windblown sand, heaps of soil or debris of any kind over the area of the Site – 5,000,000 m2
  • Excavation and filling up to final formation levels for plots and open area – 700,000 m3
  • Setting out of plots – 2,559 Nos.
  • Excavate remove and disposal unsuitable material below subgrade level- 715,180 m2
  • Excavation Works (Roads and parking)-715,180 m2
  • Backfilling works-1,000,000 m3
  • Subgrade-211,386 m3
  • Aggregate Subbase- 237,517 m3
  • Asphalt works complete including tack coat + prime coat- 405,755 ton
  • Rock mulch- 5,556 m3
  • Precast Bollards-433 Nos.
  • Interlock Tiles and Concrete Unit pavers-141,388 m2
  • Kerbs and gutters-136,850 m
  • Road marking and signages
  • Overhead gantries and signages
  • Road crossing ducts (Irrigation)-7,470 m
  • Road crossing ducts (Street Lighting)-12,000 m
  • Road crossing ducts (electrical ring mains)-150,366 m
  • Road crossing ducts (telephone)-53,163 m
  • Electrical main Station 400kv (Z)-1 No
  • Electrical Sub Main stations 132kv (A, B, C & D)-4 Nos
  • 11KV 4TR local area Substations-91 Nos
  • 1250 kva 11 kv transformers and all associated electrical works-168 Nos
  • 1000kva UDS and all associated electrical works-7 Nos
  • 132 KV cables between Main station to all sub main substations-35,000 m
  • 11 KV buried main connecting Main and sub main station to all local area 11 KV substations (Copper)s-100,500 m
  • 11 KV buried main connecting Main and sub main station to all local area 11 KV substations (Aluminums)-15,950 m
  • Street Lighting Poles, cabling and Accessories– 1241 Nos
  • Telephone Utility Networks ducts- 196,520 m
  • Telephone Utility manholes– 759 Nos
  • Branch Connections-1235 Nos
  • Earth works for water pipeline-56,700 m
  • Water Pipeline (Ductile Iron) & Fittings-56,700 m
  • Valves & fittings + RCC valve chambers and associated works-67 Nos
  • Water Pipeline Branch & plot connections-1058 Nos
  • Fresh Water Pumping Station-1 No
  • Booster Fresh water Pumping Station-1 No
  • Underground Fresh Water Tank-1 No
  • Elevated Water Tanks-2 Nos
  • StormWater HDPE pipeline earth works-17,705 m
  • Storm Water HDPE pipeline including testing, commissioning & handing over-11,202 m
  • Storm water Manholes-328 Nos
  • Gullies-1,508 Nos
  • Storm Water Pipeline Branch & plot connections-222 Nos
  • Storm Water Holding Tank (9,710m3)- 1 No
  • StormWater Pond (63,081m3)- 1 No
  • Storm water Tank Pumping station- 1 No
  • Stormwater Pond Pumping Station- 1 No
  • Earth works for sanitary works-23,647 m
  • Sanitary Sewer Pipelines HDPE-23,495 m
  • Polycrete Manholes-726 Nos
  • Sanitary Water Pipeline Branch & internal plot connections-2072 Nos
  • Irrigation Network-24,750 m
  • Underground Irrigation Tank-1 No.
  • Irrigation well with pumping system 251,240gal/day-1 No.
  • Irrigation Pumping Station-1 No.
  • Package Sewage Treatplant-5 Units
  • Fire Water Pipeline (Ductile Iron) earth works-77,593 m
  • Fire Water Pipeline (Ductile Iron) 150mm to 250mm (Avg 2m to3.5m depth)-77,593 m
  • Valves & fittings + RCC valve chambers and associated works-579 Nos
  • Under Ground Fire Water Tank (2 x 500,000 gals) -2 Nos
  • Fire Water Pumping Station-1 No.
  • Supply and install and Fire Hydrant-939 Nos.
  • Boundary Wall Fencing-5,632 m
  • Double swing, lockable ornamental steel gates at four main access points-4 Nos
  • Stone faced block work boundary wall-1,165 m
  • Main Vehicle Access Points-4 Nos.
  • CCTV SYSTEM-10,375 m
Need engineering solutions? — Contact us now
Scroll